Uganda : post-conflict reconstruction : country case evaluation /

World Bank involvement in the reconstruction efforts in Uganda have been particularly comprehensive. In the first five years after the conflict (1987-92), the Bank supported approximately 25 lending operations and was key in strengthening the Ministry of Finance and the Central Bank, removing the mo...

Full description

Bibliographic Details
Corporate Author: World Bank. Operations Evaluation Department
Other Authors: Kreimer, Alcira
Format: Book
Language:English
Published: Washington, D.C. : World Bank, 2000.
Series:World Bank operations evaluation study.
Subjects:
LEADER 04176cam a2200457Ii 4500
001 57889470-0a5b-4d4d-9d72-7561cf97711f
005 20240724000000.0
008 010319s2000 dcua ob i000 0 eng d
010 |z  00024903  
040 |a N$T  |b eng  |e pn  |e rda  |c N$T  |d OCL  |d OCLCQ  |d YDXCP  |d OCLCQ  |d CUS  |d OCLCQ  |d TUU  |d OCLCQ  |d TNF  |d OCLCO  |d OCLCQ  |d OCLCA  |d REDDC  |d LGG  |d CO3  |d QT5  |d MERUC  |d CCO  |d E7B  |d FVL  |d ZCU  |d OCLCA  |d OCLCF  |d DKDLA  |d OCLCQ  |d AU@  |d OCLCQ  |d AZK  |d MWM  |d SUR  |d MOR  |d PIFBR  |d DCWBL  |d OCLCQ  |d SAV  |d QT7 
019 |a 70739296  |a 533267173  |a 559281105  |a 646909297  |a 722781534  |a 728056772  |a 827879826  |a 961578922  |a 961599918  |a 962677652  |a 962717902  |a 970747903  |a 984879990  |a 988503633  |a 991908860  |a 992239102  |a 993932389  |a 1007398643 
020 |a 0585357943  |q (electronic bk.) 
020 |a 9780585357942  |q (electronic bk.) 
020 |a 0821346822 
020 |a 9780821346822 
035 |a (OCoLC)47009824  |z (OCoLC)70739296  |z (OCoLC)533267173  |z (OCoLC)559281105  |z (OCoLC)646909297  |z (OCoLC)722781534  |z (OCoLC)728056772  |z (OCoLC)827879826  |z (OCoLC)961578922  |z (OCoLC)961599918  |z (OCoLC)962677652  |z (OCoLC)962717902  |z (OCoLC)970747903  |z (OCoLC)984879990  |z (OCoLC)988503633  |z (OCoLC)991908860  |z (OCoLC)992239102  |z (OCoLC)993932389  |z (OCoLC)1007398643 
043 |a f-ug--- 
050 4 |a HG3881.5.W57  |b U33 2000eb 
082 0 4 |a 338.91/096761  |2 21 
049 |a LYUU 
245 0 0 |a Uganda :  |b post-conflict reconstruction : country case evaluation /  |c Alcira Kreimer [and others]. 
264 1 |a Washington, D.C. :  |b World Bank,  |c 2000. 
300 |a 1 online resource (xiv, 80 pages) :  |b illustrations. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a Operations evaluation studies 
500 |a At head of title: World Bank Operations Evaluation Department, OED. 
504 |a Includes bibliographical references (pages 79-80). 
520 |a World Bank involvement in the reconstruction efforts in Uganda have been particularly comprehensive. In the first five years after the conflict (1987-92), the Bank supported approximately 25 lending operations and was key in strengthening the Ministry of Finance and the Central Bank, removing the monopoly of the Coffee Board, assisting in sugar rehabilitation, and rebuilding roads. Despite good performance in reforming and rebuilding the economy, there have been several respects in which Bank involvement could have been improved: consensus building; use of conditionalities; and, most important, in emphasizing taxation. The Bank did not fulfill its role in strengthening the power sector nor did it fully convert its coordination role into creating an overall reconstruction strategy or a sector-by-sector plan. The Bank's performance was relatively poor in the social sectors, particularly in strengthening health and education institutions. project shortcomings concerned Bank processes and institutional arrangements: Project design needed to be process-oriented and reflect Uganda's unsettled institutional environment, particularly in the social sectors where the education and health ministries were too weak to accommodate spending, and supervening events such as decentralization and renewed conflict changed priorities. Also, projects failed to adjust for differing timetables: where they were not sequential, timetables were too short to address the projected length of recovery. 
610 2 0 |a World Bank  |z Uganda. 
650 0 |a Economic assistance  |z Uganda. 
651 0 |a Uganda  |x Economic conditions  |y 1979- 
651 0 |a Uganda  |x History  |y 1979- 
655 0 |a Electronic books. 
700 1 |a Kreimer, Alcira. 
710 2 |a World Bank.  |b Operations Evaluation Department. 
776 0 8 |i Print version:  |t Uganda.  |d Washington, D.C. : World Bank, 2000  |z 0821346822  |w (DLC) 00024903  |w (OCoLC)43385402 
830 0 |a World Bank operations evaluation study. 
999 1 0 |i 57889470-0a5b-4d4d-9d72-7561cf97711f  |l 1496028  |s US-PBL  |m ugandapost_conflict_reconstruction_country_case_evaluation_________________2000_______worlda___________________________________________________________________________e 
999 1 1 |l 1496028  |s ISIL:US-PBL  |i Lehigh  |t BKS  |a Electronic  |c Electronic book  |d Other scheme  |p UNLOANABLE